This webinar covers in detail the code generation project for the phase-shift full-bridge converter with an active secondary.
The project is implemented with the C2000 F280049C MCU from Texas Instruments and matches this hardware design verification kit from Texas Instruments: https://www.ti.com/tool/TIDM-BIDIR-400-12
It implements peak current mode control to control the phase shift on the full bridge side. The X-bar is used to control the active secondary gating based on the gating signals to the full-bridge side.
We verify the operation of the converter with a Typhoon HIL real-time simulation of the power stage with the exported code running on the processor.
If you cannot make it to the live webinar, sign up anyway and get the recording emailed automatically.